> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# A.R.S. tit. 30, ch. 1, art. 2 — Powers and Duties of Authority

- **Citation**: A.R.S. tit. 30, ch. 1, art. 2
- **Node Type**: article
- **Jurisdiction**: Arizona (state)
- **Code Body**: Arizona Revised Statutes (azleg.gov, through the 57th Legislature, 2nd Regular Session (2026)) (A.R.S.)
- **Official Source**: [https://www.azleg.gov/arsDetail/?title=30](https://www.azleg.gov/arsDetail/?title=30)
- **Canonical URL**: [https://corpuslaw.us/codes/arizona/title-30/chapter-1/article-2](https://corpuslaw.us/codes/arizona/title-30/chapter-1/article-2)
- **Semantic URL**: [https://corpuslaw.us/codes/arizona/title-30/chapter-1/article-2](https://corpuslaw.us/codes/arizona/title-30/chapter-1/article-2)

## Hierarchy

Title 30 — Power > Chapter 1 — ARIZONA POWER AUTHORITY

## Sections

| Citation | Heading | Type | Link |
| --- | --- | --- | --- |
| A.R.S. § 30-121 | Acquisition and encouragement of development of electric power | section | [View](https://corpuslaw.us/code/379d08fc-cbd8-4cbd-a32b-7d0ec2f256d5.md) |
| A.R.S. § 30-122 | Cooperation with public agencies; limitations upon powers of authority | section | [View](https://corpuslaw.us/code/f7e099e8-60c2-4cb3-aba3-1bf17e2e906a.md) |
| A.R.S. § 30-123 | Development programs for utilization of power; use of state property; right of eminent domain | section | [View](https://corpuslaw.us/code/a9913186-69f6-4f4a-af86-dee18ada5b5e.md) |
| A.R.S. § 30-123.01 | Construction, operation and maintenance of dams; generation of electrical energy; construction of storage and diversion facilities; limitations | section | [View](https://corpuslaw.us/code/817d10cf-c6ff-479c-a54e-f9f2bd271226.md) |
| A.R.S. § 30-124 | Disposition of electric power; limitations; establishment of power rates | section | [View](https://corpuslaw.us/code/c3d573ad-d916-4607-9855-250f51032a8a.md) |
| A.R.S. § 30-125 | Preferences when power supplies insufficient | section | [View](https://corpuslaw.us/code/763b54da-f812-4df5-a3c6-d7e9df08425a.md) |
| A.R.S. § 30-126 | Designation of transmission lines upon which uniform transmission voltage rate applicable | section | [View](https://corpuslaw.us/code/91444f8c-34c0-49e1-ad58-1eeccd7e1843.md) |
| A.R.S. § 30-127 | Uniform transmission voltage rate; wholesale power rates; limitations | section | [View](https://corpuslaw.us/code/27689de2-ac2c-4ab3-816e-14c480e29139.md) |
| A.R.S. § 30-127.01 | Water rights | section | [View](https://corpuslaw.us/code/9807689e-1e4c-4002-bdec-5cf6bcc5044e.md) |
| A.R.S. § 30-128 | Construction work and purchases by bid only; exceptions; award of contract; bond | section | [View](https://corpuslaw.us/code/5c99f825-e40e-40d2-9b5a-d5b6698042f8.md) |
| A.R.S. § 30-129 | Cooperation with operating units | section | [View](https://corpuslaw.us/code/e9de55ed-f59a-45d8-a0cf-0a6ec9ae9d08.md) |
