# A.R.S. § 49-252 — Closure notification and approval

- **Citation**: A.R.S. § 49-252
- **Node Type**: section
- **Jurisdiction**: Arizona (state)
- **Code Body**: Arizona Revised Statutes (azleg.gov, through the 57th Legislature, 2nd Regular Session (2026)) (A.R.S.)
- **Official Source**: [https://www.azleg.gov/ars/49/00252.htm](https://www.azleg.gov/ars/49/00252.htm)
- **Canonical URL**: [https://corpuslaw.us/codes/arizona/title-49/chapter-2/article-3/section-49-252](https://corpuslaw.us/codes/arizona/title-49/chapter-2/article-3/section-49-252)
- **Semantic URL**: [https://corpuslaw.us/codes/arizona/title-49/chapter-2/article-3/section-49-252](https://corpuslaw.us/codes/arizona/title-49/chapter-2/article-3/section-49-252)

## Hierarchy

Title 49 — The Environment > Chapter 2 — WATER QUALITY CONTROL > Article 3 — Aquifer Protection Permits

## Text

49-252. Closure notification and approval

A. A person who owns or operates a dry well subject to this article or a groundwater protection permit facility as defined in section 49-241.01, subsection C or a person who has been issued a permit pursuant to this article shall notify the director of the intent to permanently cease an activity for which the facility or a portion of the facility was designed or operated.
B. Within ninety days of the notification in subsection A of this section, the owner or operator shall submit a closure plan to the director.
C. Within sixty days of submittal of a complete closure plan, the director shall determine whether or not the closure plan is for a clean closure.
D. If the director determines that the closure plan is for a clean closure, the director shall send a letter of approval to the owner or operator and no aquifer protection permit shall be required.
E. If the director determines that the proposed closure plan achieves a closure condition other than clean closure, the owner or operator shall submit either an application for an aquifer protection permit or a request to modify a current aquifer protection permit in order to address closure activities and postclosure monitoring and maintenance at the facility. The director shall require submittal of a permit application or a request to modify a permit within ninety days or a reasonable time not to exceed one year, if the applicant can supply a scope of work justifying a schedule for collecting the technical information necessary to apply.