> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# A.R.S. § 9-554 — License required before construction

- **Citation**: A.R.S. § 9-554
- **Node Type**: section
- **Jurisdiction**: Arizona (state)
- **Code Body**: Arizona Revised Statutes (azleg.gov, through the 57th Legislature, 2nd Regular Session (2026)) (A.R.S.)
- **Official Source**: [https://www.azleg.gov/ars/9/00554.htm](https://www.azleg.gov/ars/9/00554.htm)
- **Canonical URL**: [https://corpuslaw.us/codes/arizona/title-9/chapter-5/article-4/section-9-554](https://corpuslaw.us/codes/arizona/title-9/chapter-5/article-4/section-9-554)
- **Semantic URL**: [https://corpuslaw.us/codes/arizona/title-9/chapter-5/article-4/section-9-554](https://corpuslaw.us/codes/arizona/title-9/chapter-5/article-4/section-9-554)

## Hierarchy

Title 9 — Cities and Towns > Chapter 5 — PUBLIC UTILITIES > Article 4 — Industrial Gas Pipelines

## Text

9-554. License required before construction

A. A new industrial gas pipeline shall not be constructed within any incorporated city or town or within the unincorporated area of a county before a license is issued as provided in this article.
B. A licensing authority may terminate a license according to its terms and conditions if a license holder is in default under the license.
