> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Cal. Public Contract Code - PCC § 22167. — Section 22167.

- **Citation**: Cal. Public Contract Code - PCC § 22167.
- **Node Type**: section
- **Jurisdiction**: California (state)
- **Code Body**: Public Contract Code - PCC (PCC)
- **Official Source**: [https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip](https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip)
- **Canonical URL**: [https://corpuslaw.us/codes/california/public-contract-code/division-2/part-3/chapter-4/section-22167](https://corpuslaw.us/codes/california/public-contract-code/division-2/part-3/chapter-4/section-22167)
- **Semantic URL**: [https://corpuslaw.us/codes/california/public-contract-code/division-2/part-3/chapter-4/section-22167](https://corpuslaw.us/codes/california/public-contract-code/division-2/part-3/chapter-4/section-22167)

## Hierarchy

Title PCC — Public Contract Code - PCC > Division 2. — ARTICLE 3. Compost and Co-compost Products [12180. - 12184.] > Part 3. — PART 3. CONTRACTING BY LOCAL AGENCIES [20100. - 22199.6.] > Chapter 4. — CHAPTER 4. Local Agency Design-Build Projects [22160. - 22169.]

## Text

(a)

If the local agency elects to award a project pursuant to this article, retention proceeds withheld by the local agency from the design-build entity shall not exceed 5 percent if a performance and payment bond, issued by an admitted surety insurer, is required in the solicitation of bids.

(b)

In a contract between the design-build entity and a subcontractor, and in a contract between a subcontractor and any subcontractor thereunder, the percentage of the retention proceeds withheld may not exceed the percentage specified in the contract between the local agency and the design-build entity. If the design-build entity provides written notice to any subcontractor that is not a member of the
					 design-build entity, prior to or at the time the bid is requested, that a bond may be required and the subcontractor subsequently is unable or refuses to furnish a bond to the design-build entity, then the design-build entity may withhold retention proceeds in excess of the percentage specified in the contract between the local agency and the design-build entity from any payment made by the design-build entity to the subcontractor.