> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Cal. Public Resources Code - PRC § 25504. — Section 25504.

- **Citation**: Cal. Public Resources Code - PRC § 25504.
- **Node Type**: section
- **Jurisdiction**: California (state)
- **Code Body**: Public Resources Code - PRC (PRC)
- **Official Source**: [https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip](https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip)
- **Canonical URL**: [https://corpuslaw.us/codes/california/public-resources-code/division-15/chapter-6/section-25504](https://corpuslaw.us/codes/california/public-resources-code/division-15/chapter-6/section-25504)
- **Semantic URL**: [https://corpuslaw.us/codes/california/public-resources-code/division-15/chapter-6/section-25504](https://corpuslaw.us/codes/california/public-resources-code/division-15/chapter-6/section-25504)

## Hierarchy

Title PRC — Public Resources Code - PRC > Division 15. — DIVISION 15. ENERGY CONSERVATION AND DEVELOPMENT [25000. - 25997.7.] > Chapter 6. — CHAPTER 6. Power Facility and Site Certification [25500. - 25543.]

## Text

The notice of intention shall include a statement by the applicant describing the location of the proposed sites by section or sections, range and township, and county; a summary of the proposed design criteria of the facilities; the type or types of fuels to be used; the methods of construction and operation; the proposed location of facilities and structures on each site; a preliminary statement of the relative economic, technological, and environmental advantages and disadvantages of the alternative site and related facility proposals; a statement of need for the facility and information showing the compatibility of the proposals with the most recent electricity report issued pursuant to Section 25308; and any other information that an electric utility deems desirable to submit to the commission.
