> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Cal. Public Resources Code - PRC § 2697. — Section 2697.

- **Citation**: Cal. Public Resources Code - PRC § 2697.
- **Node Type**: section
- **Jurisdiction**: California (state)
- **Code Body**: Public Resources Code - PRC (PRC)
- **Official Source**: [https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip](https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip)
- **Canonical URL**: [https://corpuslaw.us/codes/california/public-resources-code/division-2/chapter-7-8/section-2697](https://corpuslaw.us/codes/california/public-resources-code/division-2/chapter-7-8/section-2697)
- **Semantic URL**: [https://corpuslaw.us/codes/california/public-resources-code/division-2/chapter-7-8/section-2697](https://corpuslaw.us/codes/california/public-resources-code/division-2/chapter-7-8/section-2697)

## Hierarchy

Title PRC — Public Resources Code - PRC > Division 2. — CHAPTER 11. Earthquake Education [2805. - 2808.] > Chapter 7.8. — CHAPTER 7.8. Seismic Hazards Mapping [2690. - 2699.6.]

## Text

(a)

Cities and counties shall require, prior to the approval of a project located in a seismic hazard zone, a geotechnical report defining and delineating any seismic hazard.  If the city or county finds that no undue hazard of this kind exists, based on information resulting from studies conducted on sites in the immediate vicinity of the project and of similar soil composition to the project site, the geotechnical report may be waived.  After a report has been approved or a waiver granted, subsequent geotechnical reports shall not be required, provided that new geologic datum, or data, warranting further investigation is not recorded.  Each city and county shall submit one copy of each approved geotechnical report, including the mitigation measures, if any, that are to be taken, to the State Geologist within 30 days of its approval of the report.

(b)

In meeting the requirements of this section, cities and counties shall consider the policies and criteria established pursuant to this chapter.  If a project’s approval is not in accordance with the policies and criteria, the city or  county shall explain the reasons for the differences in writing to the State Geologist, within 30 days of the project’s approval.