> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Cal. Water Code - WAT § 1395. — Section 1395.

- **Citation**: Cal. Water Code - WAT § 1395.
- **Node Type**: section
- **Jurisdiction**: California (state)
- **Code Body**: Water Code - WAT (WAT)
- **Official Source**: [https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip](https://downloads.leginfo.legislature.ca.gov/pubinfo_2025.zip)
- **Canonical URL**: [https://corpuslaw.us/codes/california/water-code/division-2/part-2/chapter-6/article-4/section-1395](https://corpuslaw.us/codes/california/water-code/division-2/part-2/chapter-6/article-4/section-1395)
- **Semantic URL**: [https://corpuslaw.us/codes/california/water-code/division-2/part-2/chapter-6/article-4/section-1395](https://corpuslaw.us/codes/california/water-code/division-2/part-2/chapter-6/article-4/section-1395)

## Hierarchy

Title WAT — Water Code - WAT > Division 2. — ARTICLE 11. Proceedings when Appropriation Incomplete at Time of Determination [2801. - 2820.] > Part 2. — ARTICLE 2.5. Stockponds [1226. - 1226.4.] > Chapter 6. — CHAPTER 6. Permits [1375. - 1410.2.] > Article 4. — ARTICLE 4. Application to Beneficial Use and Construction of Works [1395. - 1398.]

## Text

Actual construction work upon any project shall begin within the time specified in the permit, which time shall not be less than 60 days from the date of the permit.
