> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# C.R.S. § 35-49-109 — Priority determined - how

- **Citation**: C.R.S. § 35-49-109
- **Node Type**: section
- **Jurisdiction**: Colorado (state)
- **Code Body**: Colorado Revised Statutes (2024 edition) (C.R.S.)
- **Official Source**: [https://leg.colorado.gov/sites/default/files/images/olls/crs2024-title-35.docx#35-49-109](https://leg.colorado.gov/sites/default/files/images/olls/crs2024-title-35.docx#35-49-109)
- **Canonical URL**: [https://corpuslaw.us/codes/colorado/title-35/chapter-49/section-35-49-109](https://corpuslaw.us/codes/colorado/title-35/chapter-49/section-35-49-109)
- **Semantic URL**: [https://corpuslaw.us/codes/colorado/title-35/chapter-49/section-35-49-109](https://corpuslaw.us/codes/colorado/title-35/chapter-49/section-35-49-109)

## Hierarchy

Title 35 — Agriculture > Chapter 49 — Livestock Water Tanks

## Text

35-49-109. Priority determined - how. The state engineer's certificate of approval of a livestock water tank on each normally dry stream and its tributaries shall be chronologically numbered in the order of approval and in concert with any erosion control dams approved pursuant to section 37-87-122, C.R.S. Priority of right as between such tanks located on or within the watershed of each such dry stream shall be determined by such numbers seriatim, number one being first in such right.
