> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# C.R.S. § 40-2-202 — Definitions

- **Citation**: C.R.S. § 40-2-202
- **Node Type**: section
- **Jurisdiction**: Colorado (state)
- **Code Body**: Colorado Revised Statutes (2024 edition) (C.R.S.)
- **Official Source**: [https://leg.colorado.gov/sites/default/files/images/olls/crs2024-title-40.docx#40-2-202](https://leg.colorado.gov/sites/default/files/images/olls/crs2024-title-40.docx#40-2-202)
- **Canonical URL**: [https://corpuslaw.us/codes/colorado/title-40/chapter-2/section-40-2-202](https://corpuslaw.us/codes/colorado/title-40/chapter-2/section-40-2-202)
- **Semantic URL**: [https://corpuslaw.us/codes/colorado/title-40/chapter-2/section-40-2-202](https://corpuslaw.us/codes/colorado/title-40/chapter-2/section-40-2-202)

## Hierarchy

Title 40 — Utilities > Chapter 2 — Public Utilities Commission - Renewable Energy Standard

## Text

40-2-202. Definitions. As used in this part 2, unless the context otherwise requires:

(1) "Electric utility" means an investor-owned electric utility subject to regulation under articles 1 to 7 of this title 40.

(2) "Energy storage system" means commercially available technology that is capable of retaining energy, storing the energy for a period of time, and delivering the energy after storage by chemical, thermal, mechanical, or other means.

(3) "Procure" or "procurement" means to acquire by ownership or by a contractual right to use the energy from, or the capacity of, an energy storage system.
