> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Conn. Gen. Stat. § 16a-47d — Real-time energy alert system.

- **Citation**: Conn. Gen. Stat. § 16a-47d
- **Node Type**: section
- **Jurisdiction**: Connecticut (state)
- **Code Body**: General Statutes of Connecticut (revised to January 1, 2025, with 2026 Supplement) (Conn. Gen. Stat.)
- **Official Source**: [https://www.cga.ct.gov/current/pub/chap_298.htm#sec_16a-47d](https://www.cga.ct.gov/current/pub/chap_298.htm#sec_16a-47d)
- **Canonical URL**: [https://corpuslaw.us/codes/connecticut/title-16a/chapter-298/section-16a-47d](https://corpuslaw.us/codes/connecticut/title-16a/chapter-298/section-16a-47d)
- **Semantic URL**: [https://corpuslaw.us/codes/connecticut/title-16a/chapter-298/section-16a-47d](https://corpuslaw.us/codes/connecticut/title-16a/chapter-298/section-16a-47d)

## Hierarchy

Title 16a — Planning and Energy Policy > Chapter 298 — Energy Utilization and Conservation

## Text

16a-47d. Real-time energy alert system.

As part of the energy efficiency and outreach marketing campaign established pursuant to section 16a-47a, on or before April 1, 2008, the Public Utilities Regulatory Authority shall, in consultation with the Energy Conservation Management Board, established pursuant to section 16-245m, develop a real-time energy electronic mail and cellular phone alert system to notify the public of the need to reduce energy consumption during peak power periods.

(P.A. 07-242, S. 100; P.A. 11-80, S. 1.)

History: P.A. 07-242 effective July 1, 2007; pursuant to P.A. 11-80, “Department of Public Utility Control” was changed editorially by the Revisors to “Public Utilities Regulatory Authority”, effective July 1, 2011.
