> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Conn. Gen. Stat. § 7-222a — Rate for interconnection of generation facilities.

- **Citation**: Conn. Gen. Stat. § 7-222a
- **Node Type**: section
- **Jurisdiction**: Connecticut (state)
- **Code Body**: General Statutes of Connecticut (revised to January 1, 2025, with 2026 Supplement) (Conn. Gen. Stat.)
- **Official Source**: [https://www.cga.ct.gov/current/pub/chap_101.htm#sec_7-222a](https://www.cga.ct.gov/current/pub/chap_101.htm#sec_7-222a)
- **Canonical URL**: [https://corpuslaw.us/codes/connecticut/title-7/chapter-101/section-7-222a](https://corpuslaw.us/codes/connecticut/title-7/chapter-101/section-7-222a)
- **Semantic URL**: [https://corpuslaw.us/codes/connecticut/title-7/chapter-101/section-7-222a](https://corpuslaw.us/codes/connecticut/title-7/chapter-101/section-7-222a)

## Hierarchy

Title 7 — Municipalities > Chapter 101 — Municipal Gas and Electric Plants

## Text

7-222a. Rate for interconnection of generation facilities.

Not later than October 1, 2004, each municipal electric utility, including any participating municipal electric utility, as defined in section 16-1, shall, in consultation with the municipal electric energy cooperative established under chapter 101a, set, pursuant to section 7-222, a rate for the interconnection of generation facilities into its transmission and distribution system, which generation facilities are located in the service territory of the municipal electric utility and began operations after June 26, 2003.

(P.A. 03-135, S. 16.)

History: P.A. 03-135 effective June 26, 2003.
