> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Del. Code tit. 26, § 804 — Additional duties of facility owners and facility operators who are also underground pipeline facility operators.

- **Citation**: Del. Code tit. 26, § 804
- **Node Type**: section
- **Jurisdiction**: Delaware (state)
- **Code Body**: Delaware Code (Del. C.)
- **Official Source**: [https://delcode.delaware.gov/title26/c008/sc01/index.html](https://delcode.delaware.gov/title26/c008/sc01/index.html)
- **Canonical URL**: [https://corpuslaw.us/codes/delaware/title-26/chapter-8/section-804](https://corpuslaw.us/codes/delaware/title-26/chapter-8/section-804)
- **Semantic URL**: [https://corpuslaw.us/codes/delaware/title-26/chapter-8/section-804](https://corpuslaw.us/codes/delaware/title-26/chapter-8/section-804)

## Hierarchy

Title 26 — Public Utilities > Chapter 8 — Underground Utility Damage Prevention and Safety

## Text

It shall be the duty of each underground pipeline facility owner or facility operator to:

(1) Participate in the approved notification center.

(2) Provide as follows for inspection of pipelines that such operator has reason to believe could be damaged by excavation activities:

a. The inspection must be done as frequently as necessary during and after the excavation activities to verify the integrity of the pipeline; and

b. In case of blasting, any inspection must include leakage surveys.
