> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# 10 U.S.C. § 6285 — Life-cycle cost estimates of certain atomic energy defense capital assets

- **Citation**: 10 U.S.C. § 6285
- **Node Type**: section
- **Jurisdiction**: United States (federal)
- **Code Body**: United States Code (USC)
- **Official Source**: [https://uscode.house.gov/download/releasepoints/us/pl/119/95/xml_usc10@119-95.zip](https://uscode.house.gov/download/releasepoints/us/pl/119/95/xml_usc10@119-95.zip)
- **Canonical URL**: [https://corpuslaw.us/codes/federal/us-code/title-10/subtitle-a/subpart-b/chapter-607/subchapter-i/section-6285](https://corpuslaw.us/codes/federal/us-code/title-10/subtitle-a/subpart-b/chapter-607/subchapter-i/section-6285)
- **Semantic URL**: [https://corpuslaw.us/codes/federal/us-code/title-10/subtitle-a/subpart-b/chapter-607/subchapter-i/section-6285](https://corpuslaw.us/codes/federal/us-code/title-10/subtitle-a/subpart-b/chapter-607/subchapter-i/section-6285)

## Hierarchy

Title 10 — Armed Forces > Subtitle A > Subpart B > Chapter 607 > Subchapter I

## Text

(a) In General.—The Secretary of Energy shall ensure that an independent life-cycle cost estimate under Department of Energy Order 413.3B (relating to program management and project management for the acquisition of capital assets), or a successor order, of each capital asset described in subsection (b) is conducted before the asset achieves critical decision 2 in the acquisition process.

(b) Capital Assets Described.—A capital asset described in this subsection is an atomic energy defense capital asset—(1) the total project cost of which exceeds $100,000,000; and (2) the purpose of which is to perform a limited-life, single-purpose mission.

(c) Independent Defined.—For purposes of subsection (a), the term “independent”, with respect to a life-cycle cost estimate of a capital asset, means that the life-cycle cost estimate is prepared by an organization independent of the project sponsor, using the same detailed technical and procurement information as the sponsor, to determine if the life-cycle cost estimate of the sponsor is accurate and reasonable.
