> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# 33 U.S.C. § 649 — Vicksburg Harbor and Ohio River below Cache River

- **Citation**: 33 U.S.C. § 649
- **Node Type**: section
- **Jurisdiction**: United States (federal)
- **Code Body**: United States Code (USC)
- **Official Source**: [https://uscode.house.gov/download/releasepoints/us/pl/119/95/xml_usc33@119-95.zip](https://uscode.house.gov/download/releasepoints/us/pl/119/95/xml_usc33@119-95.zip)
- **Canonical URL**: [https://corpuslaw.us/codes/federal/us-code/title-33/chapter-13/section-649](https://corpuslaw.us/codes/federal/us-code/title-33/chapter-13/section-649)
- **Semantic URL**: [https://corpuslaw.us/codes/federal/us-code/title-33/chapter-13/section-649](https://corpuslaw.us/codes/federal/us-code/title-33/chapter-13/section-649)

## Hierarchy

Title 33 — Navigation and Navigable Waters > Chapter 13

## Text

The harbor at Vicksburg, Mississippi, and the Ohio River from its mouth to the mouth of the Cache River, are transferred to and placed under the control and jurisdiction of the Mississippi River Commission: Provided, That no part of the improvement of the Ohio River, with a view to the construction of locks and dams, shall be considered as transferred to or placed under the control and jurisdiction of the Mississippi River Commission.
