> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# 7 U.S.C. § 905 — Fees for certain loan guarantees

- **Citation**: 7 U.S.C. § 905
- **Node Type**: section
- **Jurisdiction**: United States (federal)
- **Code Body**: United States Code (USC)
- **Official Source**: [https://uscode.house.gov/download/releasepoints/us/pl/119/95/xml_usc07@119-95.zip](https://uscode.house.gov/download/releasepoints/us/pl/119/95/xml_usc07@119-95.zip)
- **Canonical URL**: [https://corpuslaw.us/codes/federal/us-code/title-7/chapter-31/subchapter-i/section-905](https://corpuslaw.us/codes/federal/us-code/title-7/chapter-31/subchapter-i/section-905)
- **Semantic URL**: [https://corpuslaw.us/codes/federal/us-code/title-7/chapter-31/subchapter-i/section-905](https://corpuslaw.us/codes/federal/us-code/title-7/chapter-31/subchapter-i/section-905)

## Hierarchy

Title 7 — Agriculture > Chapter 31 > Subchapter I

## Text

(a) In generalFor electrification baseload generation loan guarantees, the Secretary shall, at the request of the borrower, charge an upfront fee to cover the costs of the loan guarantee.

(b) FeeThe fee described in subsection (a) for a loan guarantee shall be equal to the costs of the loan guarantee (within the meaning of section 661a(5)(C) of title 2).

(c) LimitationFunds received from a borrower to pay the fee described in this section shall not be derived from a loan or other debt obligation that is made or guaranteed by the Federal Government.
