> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# 110 ILCS 62/10

- **Citation**: 110 ILCS 62/10
- **Node Type**: section
- **Jurisdiction**: Illinois (state)
- **Code Body**: Illinois Compiled Statutes (Aug. 2026 snapshot) (ILCS)
- **Official Source**: [https://www.ilga.gov/legislation/ilcs/ilcs.asp](https://www.ilga.gov/legislation/ilcs/ilcs.asp)
- **Canonical URL**: [https://corpuslaw.us/codes/illinois/chapter-110/part-62/section-10](https://corpuslaw.us/codes/illinois/chapter-110/part-62/section-10)
- **Semantic URL**: [https://corpuslaw.us/codes/illinois/chapter-110/part-62/section-10](https://corpuslaw.us/codes/illinois/chapter-110/part-62/section-10)

## Hierarchy

Chapter 110 > Part 62

## Text

(110 ILCS 62/10) Sec. 10. Evaluation of proposal. Before entering into a guaranteed energy savings contract under Section 15, a public university shall submit a request for proposals. The public university shall evaluate any sealed proposal from a qualified provider. The evaluation shall analyze the estimates of all costs of installations, modifications or remodeling, including, without limitation, costs of a pre-installation energy audit or analysis, design, engineering, installation, maintenance, repairs, debt service, conversions to a different energy or fuel source, or post-installation project monitoring, data collection, and reporting. The evaluation shall include a detailed analysis of whether either the energy consumed or the operating costs, or both, will be reduced. If technical assistance is not available by a licensed architect or registered professional engineer on the staff of the public university, then the evaluation of the proposal shall be done by a registered professional engineer or architect, who is retained by the public university. Any licensed architect or registered professional engineer evaluating a proposal under this Section may not have any financial or contractual relationship with a qualified provider or other source that would constitute a conflict of interest. The public university may pay a reasonable fee for evaluation of the proposal or include the fee as part of the payments made under Section 20. (Source: P.A. 94-1062, eff. 7-31-06.)
