> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Ind. Code ch. 8-1-42

- **Citation**: Ind. Code ch. 8-1-42
- **Node Type**: chapter
- **Jurisdiction**: Indiana (state)
- **Code Body**: Indiana Code (Aug. 2026 snapshot) (Ind. Code)
- **Official Source**: [https://iga.in.gov/laws/2026/ic/titles/8](https://iga.in.gov/laws/2026/ic/titles/8)
- **Canonical URL**: [https://corpuslaw.us/codes/indiana/title-8/chapter-8-1-42](https://corpuslaw.us/codes/indiana/title-8/chapter-8-1-42)
- **Semantic URL**: [https://corpuslaw.us/codes/indiana/title-8/chapter-8-1-42](https://corpuslaw.us/codes/indiana/title-8/chapter-8-1-42)

## Hierarchy

Title 8

## Sections

| Citation | Heading | Type | Link |
| --- | --- | --- | --- |
| Ind. Code § 8-1-42-1 | Applicability; "solar energy ready community" | section | [View](https://corpuslaw.us/code/457854e0-ce9e-44d5-b5cc-7939b75c6bcc.md) |
| Ind. Code § 8-1-42-2 | "Commercial solar energy system" | section | [View](https://corpuslaw.us/code/9fc07f3c-4546-416c-9cf6-18d5a78f8009.md) |
| Ind. Code § 8-1-42-3 | "Commercial solar regulation" | section | [View](https://corpuslaw.us/code/2135e5e0-53b6-4359-8356-a8881214783d.md) |
| Ind. Code § 8-1-42-4 | "Dwelling" | section | [View](https://corpuslaw.us/code/d1befbd1-3dec-4f4a-b30b-5f440ad0d3b2.md) |
| Ind. Code § 8-1-42-5 | "Nonparticipating property" | section | [View](https://corpuslaw.us/code/395492ec-0240-454c-a1fe-2da8bd6742a5.md) |
| Ind. Code § 8-1-42-6 | "Permit authority" | section | [View](https://corpuslaw.us/code/5ef10669-186d-4d0d-b471-d31a19277647.md) |
| Ind. Code § 8-1-42-7 | "Project owner" | section | [View](https://corpuslaw.us/code/e681b4b1-b9c0-4648-bc98-6bc1e9459c30.md) |
| Ind. Code § 8-1-42-8 | "Unit" | section | [View](https://corpuslaw.us/code/0cbc2cba-af4e-4fa0-9381-4bac579a53f1.md) |
| Ind. Code § 8-1-42-9 | Permit authority responsible for enforcing compliance with standards; authority to adopt less restrictive standards or to waive or make less restrictive existing standards; unit's planning and zoning powers not affected | section | [View](https://corpuslaw.us/code/0a8ade40-dd75-4d9d-8ee0-4b59a721c563.md) |
| Ind. Code § 8-1-42-10 | Setback requirements; highways, collector roads, and local roads; nonparticipating properties; landscape buffer; height restriction; waiver of setback and buffer requirements with consent of nonparticipating property owner | section | [View](https://corpuslaw.us/code/1062e8d0-fc06-46a0-9305-a060309f34dd.md) |
| Ind. Code § 8-1-42-11 | Ground cover; vegetation plan | section | [View](https://corpuslaw.us/code/7d9215e4-904f-4a3d-9e41-78e547436e00.md) |
| Ind. Code § 8-1-42-12 | Fencing | section | [View](https://corpuslaw.us/code/9eb3c851-7475-4602-9888-a03f7b649624.md) |
| Ind. Code § 8-1-42-13 | Underground cables; aboveground infrastructure; depth of buried cables; cables and lines outside of project site | section | [View](https://corpuslaw.us/code/375e78a2-5640-4f3e-8117-4151662ddee1.md) |
| Ind. Code § 8-1-42-14 | Glare minimization; adjacent properties and roadways; vehicular traffic | section | [View](https://corpuslaw.us/code/be18c145-710a-437f-825b-888f3476ccf3.md) |
| Ind. Code § 8-1-42-15 | Signal interference | section | [View](https://corpuslaw.us/code/1f6afa89-e22b-4057-bde7-a644f7237faa.md) |
| Ind. Code § 8-1-42-16 | Sound level limitations; waiver of requirement with consent of owners of adjacent nonparticipating properties | section | [View](https://corpuslaw.us/code/2c1f8c92-9604-4280-8f47-719cfeb9b30c.md) |
| Ind. Code § 8-1-42-17 | Damage to drainage infrastructure; repair; installation of new infrastructure | section | [View](https://corpuslaw.us/code/640ba22e-fc1e-4223-bd91-5d49dd2657ed.md) |
| Ind. Code § 8-1-42-18 | Decommissioning and site restoration plan; posting of surety bond or equivalent security; required posting increments; adjustment of bond or security after periodic reevaluation of decommissioning costs; costs to be net of estimated salvage value; project owner's notice of intent to decommission CSE system; ground restoration; project owner's failure to remove project assets; assets allowed to remain in place with landowner's consent | section | [View](https://corpuslaw.us/code/0951c6a0-353c-4440-a24f-34590e5379ae.md) |
| Ind. Code § 8-1-42-19 | CSE system's failure to generate electricity; presumed abandonment; required removal of project assets; project owner's failure to remove assets; removal of assets by permit authority; recovery of costs | section | [View](https://corpuslaw.us/code/ce1b1a77-df29-4101-95db-186fc339ec7b.md) |
| Ind. Code § 8-1-42-20 | "Force majeure event"; cessation of electricity generation; project owner's notice to permit authority; failure to resume operations; presumed abandonment; project owner's failure to remove assets; removal of assets by permit authority; recovery of costs | section | [View](https://corpuslaw.us/code/190742d7-4503-4468-b9aa-d55fc2399ff7.md) |
