> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Iowa Code § 476A.2 — Certificate required.

- **Citation**: Iowa Code § 476A.2
- **Node Type**: section
- **Jurisdiction**: Iowa (state)
- **Code Body**: Iowa Code (2026 edition) (Iowa Code)
- **Official Source**: [https://www.legis.iowa.gov/docs/code/2026/476A.2.pdf](https://www.legis.iowa.gov/docs/code/2026/476A.2.pdf)
- **Canonical URL**: [https://corpuslaw.us/codes/iowa/title-xi/chapter-476a/subchapter-i/section-476a-2](https://corpuslaw.us/codes/iowa/title-xi/chapter-476a/subchapter-i/section-476a-2)
- **Semantic URL**: [https://corpuslaw.us/codes/iowa/title-xi/chapter-476a/subchapter-i/section-476a-2](https://corpuslaw.us/codes/iowa/title-xi/chapter-476a/subchapter-i/section-476a-2)

## Hierarchy

Title XI — NATURAL RESOURCES > Chapter 476A — ELECTRIC POWER GENERATION AND TRANSMISSION > Subchapter I — ELECTRIC POWER GENERATING
FACILITIES

## Text

476A.2. Certificate required.

1. Commencing January 1, 1977, a person shall not commence to construct a facility except as provided in section 476A.9 unless a certificate for the facility has been issued by the commission. This subchapter shall not apply to persons who prior to July 1, 1976:

a. Have acquired a site for a facility; and,

b. Have publicly announced the intention to construct a facility; and,

c. Have let contracts for major components of a facility.

2. Any significant alteration, as determined by the commission, in the location, construction, maintenance, or operation of a facility whether constructed before or after July 1, 1976, shall require an application for an amendment to a certificate or a certificate, whichever is appropriate. “Significant alteration” shall include but shall not be limited to a change in the type of fuel used by the major electric generating facility.

3. Any person required to obtain a certificate or an amendment to a certificate shall construct, operate and maintain the facility according to the terms of the certificate and any amendments to the certificate. A certificate shall only be issued pursuant to this subchapter.

4. This subchapter shall not apply to an electric power generating plant, or combination of plants at a single site, with a total capacity of more than twenty-five but less than one hundred megawatts of electricity if the owner or operator prior to January 1, 1990, has met all of the following conditions:

a. Acquired a site for the facility.

b. Publicly announced the intention to construct a facility at that site.

c. Let contracts for major components of the facility.

[C77, 79, 81, §476A.2] 90 Acts, ch 1252, §42; 2001 Acts, 1st Ex, ch 4, §35, 362024 Acts, ch 1170, §369