> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# La. Civ. Code art. 2758 — Destruction of work before delivery, liability of contractor furnishing materials.

- **Citation**: La. Civ. Code art. 2758
- **Node Type**: section
- **Jurisdiction**: Louisiana (state)
- **Code Body**: Louisiana Revised Statutes, Codes and Constitution (through the 2025 First Extraordinary Session, with 2026 Regular Session changes the Legislature had merged by Nov. 15, 2026) (La. Laws)
- **Official Source**: [https://legis.la.gov/legis/Law.aspx?d=109823](https://legis.la.gov/legis/Law.aspx?d=109823)
- **Canonical URL**: [https://corpuslaw.us/codes/louisiana/civil-code/section-2758](https://corpuslaw.us/codes/louisiana/civil-code/section-2758)
- **Semantic URL**: [https://corpuslaw.us/codes/louisiana/civil-code/section-2758](https://corpuslaw.us/codes/louisiana/civil-code/section-2758)

## Hierarchy

Division CC — Civil Code

## Text

2758. Destruction of work before delivery, liability of contractor furnishing materials.

When the undertaker furnishes the materials for the work, if the work be destroyed, in whatever manner it may happen, previous to its being delivered to the owner, the loss shall be sustained by the undertaker, unless the proprietor be in default for not receiving it, though duly notified to do so.*

*"Though duly notified to do so" has no counterpart in French text.
