> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# 38 M.R.S. §2123-A — State plan contents

- **Citation**: 38 M.R.S. §2123-A
- **Node Type**: section
- **Jurisdiction**: Maine (state)
- **Code Body**: Maine Revised Statutes (through October 1, 2026) (M.R.S.)
- **Official Source**: [https://legislature.maine.gov/statutes/38/title38sec2123-A.html](https://legislature.maine.gov/statutes/38/title38sec2123-A.html)
- **Canonical URL**: [https://corpuslaw.us/codes/maine/title-38/chapter-24/subchapter-2/section-2123-a](https://corpuslaw.us/codes/maine/title-38/chapter-24/subchapter-2/section-2123-a)
- **Semantic URL**: [https://corpuslaw.us/codes/maine/title-38/chapter-24/subchapter-2/section-2123-a](https://corpuslaw.us/codes/maine/title-38/chapter-24/subchapter-2/section-2123-a)

## Hierarchy

Title 38 — WATERS AND NAVIGATION > Chapter 24 — SOLID WASTE MANAGEMENT AND RECYCLING > Subchapter 2 — SOLID WASTE PLANNING

## Text

2123-A. State plan contents

The state plan includes the following elements.

1. Waste characterization. The state plan must be based on a comprehensive analysis of solid waste generated, recycled and disposed of in the State. Data collected must include, but not be limited to, the source, type and amount of waste currently generated; and the costs and types of waste management employed including recycling, composting, landspreading, incineration or landfilling.

2. Waste reduction and recycling assessment. The state plan must include an assessment of the extent to which waste generation could be reduced at the source and the extent to which recycling can be increased.

3. Determination of existing and potential disposal capacity. The state plan must identify existing solid waste disposal and management capacity within the State and the potential for expansion of that capacity.

4. Projected demand for capacity. The state plan must identify the need in the State for current and future solid waste disposal capacity by type of solid waste, including identification of need over the next 5-year, 10-year and 20-year periods.

PL 1995, c. 465, §A36 (NEW). PL 1995, c. 465, §C2 (AFF).
