> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Minn. Stat. § 115A.192 — REQUEST FOR PROPOSALS; STABILIZATION AND CONTAINMENT FACILITY.

- **Citation**: Minn. Stat. § 115A.192
- **Node Type**: section
- **Jurisdiction**: Minnesota (state)
- **Code Body**: Minnesota Statutes (2025 edition) (Minn. Stat.)
- **Official Source**: [https://www.revisor.mn.gov/statutes/cite/115A.192](https://www.revisor.mn.gov/statutes/cite/115A.192)
- **Canonical URL**: [https://corpuslaw.us/codes/minnesota/chapter-115a/section-115a-192](https://corpuslaw.us/codes/minnesota/chapter-115a/section-115a-192)
- **Semantic URL**: [https://corpuslaw.us/codes/minnesota/chapter-115a/section-115a-192](https://corpuslaw.us/codes/minnesota/chapter-115a/section-115a-192)

## Hierarchy

Chapter 115A — WASTE MANAGEMENT

## Text

115A.192. REQUEST FOR PROPOSALS; STABILIZATION AND CONTAINMENT FACILITY.

Subdivision 1. Request for proposals.
The commissioner shall issue requests for proposals for the development and operation of a stabilization and containment facility. The request must be designed to obtain detailed information about the qualifications of a respondent to develop and operate the facility; the capital and operating costs of the facility and the sources and methods by which the respondent plans to finance the facility; the technical specifications of the proposed facility and the technologies to be employed for processing, stabilization, containment, and monitoring; the requirements of the site for the proposed facility; the schedule for developing and commencing operation of the facility; and other matters which the commissioner deems necessary for the agency to evaluate and select a developer and operator for the facility. Before issuing the requests, the commissioner shall prepare a draft of clauses (1) to (5) of the report required by section 115A.193, paragraph (a). The draft must accompany the requests for proposals.

Subd. 2. Selection of developer; procedure.
After evaluating responses to the request for proposals and before selecting a site as provided in section 115A.194, the agency shall decide whether to select a developer for a stabilization and containment facility. If the agency selects a developer it shall proceed as provided in section 115A.194 to select a site for the development of a facility. If the agency decides not to select a developer, the agency shall proceed as provided in section 115A.194 to select and acquire a site for potential future development of a facility.

1986 c 425 s 25; 1989 c 335 art 1 s 269; 1Sp2005 c 1 art 2 s 161; 2023 c 25 s 30
