> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Minn. Stat. § 177.435 — FACILITY CONSTRUCTION; PREVAILING WAGE.

- **Citation**: Minn. Stat. § 177.435
- **Node Type**: section
- **Jurisdiction**: Minnesota (state)
- **Code Body**: Minnesota Statutes (2025 edition) (Minn. Stat.)
- **Official Source**: [https://www.revisor.mn.gov/statutes/cite/177.435](https://www.revisor.mn.gov/statutes/cite/177.435)
- **Canonical URL**: [https://corpuslaw.us/codes/minnesota/chapter-177/section-177-435](https://corpuslaw.us/codes/minnesota/chapter-177/section-177-435)
- **Semantic URL**: [https://corpuslaw.us/codes/minnesota/chapter-177/section-177-435](https://corpuslaw.us/codes/minnesota/chapter-177/section-177-435)

## Hierarchy

Chapter 177 — LABOR STANDARDS AND WAGES

## Text

177.435. FACILITY CONSTRUCTION; PREVAILING WAGE.

Construction of value-added agricultural product processing facility financed in whole or in part with a loan or grant provided under section 41A.035, 41B.044, or 41B.046 is a "project" as that term is defined in section 177.42, subdivision 2. Contracts for the construction or expansion of a value-added agricultural product processing facility that is a project under this section must comply with section 177.43 if the loan or grant agreement was entered into on or after December 31, 1995.

1995 c 220 s 113
