> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Neb. Rev. Stat. § 37-1720 — Guidelines for entering into contracts.

- **Citation**: Neb. Rev. Stat. § 37-1720
- **Node Type**: section
- **Jurisdiction**: Nebraska (state)
- **Code Body**: Nebraska Revised Statutes (through Laws 2026) (Neb. Rev. Stat.)
- **Official Source**: [https://nebraskalegislature.gov/laws/statutes.php?statute=37-1720](https://nebraskalegislature.gov/laws/statutes.php?statute=37-1720)
- **Canonical URL**: [https://corpuslaw.us/codes/nebraska/chapter-37/section-37-1720](https://corpuslaw.us/codes/nebraska/chapter-37/section-37-1720)
- **Semantic URL**: [https://corpuslaw.us/codes/nebraska/chapter-37/section-37-1720](https://corpuslaw.us/codes/nebraska/chapter-37/section-37-1720)

## Hierarchy

Chapter 37 — GAME AND PARKS

## Text

37-1720. Guidelines for entering into contracts.

The commission shall adopt guidelines for entering into a design-build contract or construction manager-general contractor contract. The guidelines shall include the following:

(1) Preparation and content of requests for qualifications;

(2) Preparation and content of requests for proposals;

(3) Qualification and short-listing of design-builders and construction managers. The guidelines shall provide that the commission will evaluate prospective design-builders and construction managers based on the information submitted to the commission in response to a request for qualifications and will select a short list of design-builders or construction managers who shall be considered qualified and eligible to respond to the request for proposals;

(4) Preparation and submittal of proposals;

(5) Procedures and standards for evaluating proposals;

(6) Procedures for negotiations between the commission and the design-builders or construction managers submitting proposals prior to the acceptance of a proposal if any such negotiations are contemplated; and

(7) Procedures for the evaluation of construction under a design-build contract to determine adherence to the project performance criteria.

Laws 2018, LB775, § 21.
