> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Neb. Rev. Stat. § 39-814 — Bridge construction; yearly contracts; metal substructures; terms.

- **Citation**: Neb. Rev. Stat. § 39-814
- **Node Type**: section
- **Jurisdiction**: Nebraska (state)
- **Code Body**: Nebraska Revised Statutes (through Laws 2026) (Neb. Rev. Stat.)
- **Official Source**: [https://nebraskalegislature.gov/laws/statutes.php?statute=39-814](https://nebraskalegislature.gov/laws/statutes.php?statute=39-814)
- **Canonical URL**: [https://corpuslaw.us/codes/nebraska/chapter-39/section-39-814](https://corpuslaw.us/codes/nebraska/chapter-39/section-39-814)
- **Semantic URL**: [https://corpuslaw.us/codes/nebraska/chapter-39/section-39-814](https://corpuslaw.us/codes/nebraska/chapter-39/section-39-814)

## Hierarchy

Chapter 39 — HIGHWAYS AND BRIDGES

## Text

39-814. Bridge construction; yearly contracts; metal substructures; terms.

In the event the substructure of such bridges or approaches is wholly or in part of iron, steel or other metal, the contract for the portion of the substructure to be built of iron, steel or other metal shall be let at a specified sum per lineal foot for tubing, and at a specified sum per pound for all other metal in place.

Laws 1905, c. 126, § 4, p. 540; R.S.1913, § 2959; C.S.1922, § 2717; C.S.1929, § 39-804; R.S.1943, § 39-814.
