> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Nev. Rev. Stat. § 278.0195 — Utility project defined.

- **Citation**: Nev. Rev. Stat. § 278.0195
- **Node Type**: section
- **Jurisdiction**: Nevada (state)
- **Code Body**: Nevada Revised Statutes (Nev. Rev. Stat.)
- **Official Source**: [https://www.leg.state.nv.us/nrs/NRS-278.html](https://www.leg.state.nv.us/nrs/NRS-278.html)
- **Canonical URL**: [https://corpuslaw.us/codes/nevada/title-22/chapter-278/section-278-0195](https://corpuslaw.us/codes/nevada/title-22/chapter-278/section-278-0195)
- **Semantic URL**: [https://corpuslaw.us/codes/nevada/title-22/chapter-278/section-278-0195](https://corpuslaw.us/codes/nevada/title-22/chapter-278/section-278-0195)

## Hierarchy

Title 22 — COOPERATIVE AGREEMENTS BY PUBLIC AGENCIES;
REGIONAL TRANSPORTATION COMMISSIONS; PLANNING AND ZONING; DEVELOPMENT AND
REDEVELOPMENT > Chapter 278 — PLANNING AND ZONING

## Text

Utility project means:

1. An electric transmission line which is designed to operate at 200 kilovolts or more; or

2. A line used to transport natural gas which operates at 20 percent or more of the specified minimum yield strength of the material from which the line is constructed,

Ê which has been approved for construction after October 1, 1991, by the State or Federal Government or a governing body.
