> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Nev. Rev. Stat. § 322.130 — Fee for permit for dredging or filling, construction or installation of certain structures.

- **Citation**: Nev. Rev. Stat. § 322.130
- **Node Type**: section
- **Jurisdiction**: Nevada (state)
- **Code Body**: Nevada Revised Statutes (Nev. Rev. Stat.)
- **Official Source**: [https://www.leg.state.nv.us/nrs/NRS-322.html](https://www.leg.state.nv.us/nrs/NRS-322.html)
- **Canonical URL**: [https://corpuslaw.us/codes/nevada/title-26/chapter-322/section-322-130](https://corpuslaw.us/codes/nevada/title-26/chapter-322/section-322-130)
- **Semantic URL**: [https://corpuslaw.us/codes/nevada/title-26/chapter-322/section-322-130](https://corpuslaw.us/codes/nevada/title-26/chapter-322/section-322-130)

## Hierarchy

Title 26 — PUBLIC LANDS > Chapter 322 — USE OF STATE LANDS

## Text

Except as otherwise provided by specific statute, the State Land Registrar shall charge for:

1. A permit to engage in a project for dredging or filling, to construct or install any gabion, riprap or similar protective structure on state land or in a navigable body of water, or to construct or install any groin, seawall, breakwater, jetty or similar protective structure in a navigable body of water, for:

(a) Any commercial use other than an agricultural use, a fee of $1,000.

(b) Any agricultural use, a fee of $300.

(c) Any other use, except as otherwise provided in subsection 2, a fee of $250.

2. A permit to engage in recreational dredging, a fee of $50 per year or $5 per day.

3. A permit to construct or install a structure on state land for the diversion of water to irrigate any land for agricultural use, a fee of $100. The State Land Registrar shall not charge a fee for the use of state land to maintain or repair such a structure.
