> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Nev. Rev. Stat. § 40.667 — Effect of written waiver or settlement agreement when contractor fails to correct or repair defect properly; conditions to bringing action; effect of failure to prevail in action.

- **Citation**: Nev. Rev. Stat. § 40.667
- **Node Type**: section
- **Jurisdiction**: Nevada (state)
- **Code Body**: Nevada Revised Statutes (Nev. Rev. Stat.)
- **Official Source**: [https://www.leg.state.nv.us/nrs/NRS-040.html](https://www.leg.state.nv.us/nrs/NRS-040.html)
- **Canonical URL**: [https://corpuslaw.us/codes/nevada/title-3/chapter-40/section-40-667](https://corpuslaw.us/codes/nevada/title-3/chapter-40/section-40-667)
- **Semantic URL**: [https://corpuslaw.us/codes/nevada/title-3/chapter-40/section-40-667](https://corpuslaw.us/codes/nevada/title-3/chapter-40/section-40-667)

## Hierarchy

Title 3 — REMEDIES; SPECIAL ACTIONS AND PROCEEDINGS > Chapter 40 — ACTIONS AND PROCEEDINGS IN
PARTICULAR CASES CONCERNING PROPERTY

## Text

1. Except as otherwise provided in subsection 2, a written waiver or settlement agreement executed by a claimant after a contractor has corrected or otherwise repaired a constructional defect does not bar a claim for the constructional defect if it is determined that the contractor failed to correct or repair the defect properly.

2. The provisions of subsection 1 do not apply to any written waiver or settlement agreement described in subsection 1, unless:

(a) The claimant has obtained the opinion of an expert concerning the constructional defect;

(b) The claimant has provided the contractor with a written notice of the defect pursuant to NRS 40.645 and a copy of the experts opinion; and

(c) The claimant and the contractor have complied with the requirements for inspection and repair as provided in NRS 40.600 to 40.695 , inclusive.

3. The provisions of this section do not apply to repairs which are made pursuant to an election to repair pursuant to NRS 40.6472 .

4. If a claimant does not prevail in any action which is not barred pursuant to this section, the court may:

(a) Deny the claimants attorneys fees, fees for an expert witness or costs; and

(b) Award attorneys fees and costs to the contractor.
