> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Nev. Rev. Stat. § 349.937 — Cost of a water project defined.

- **Citation**: Nev. Rev. Stat. § 349.937
- **Node Type**: section
- **Jurisdiction**: Nevada (state)
- **Code Body**: Nevada Revised Statutes (Nev. Rev. Stat.)
- **Official Source**: [https://www.leg.state.nv.us/nrs/NRS-349.html](https://www.leg.state.nv.us/nrs/NRS-349.html)
- **Canonical URL**: [https://corpuslaw.us/codes/nevada/title-30/chapter-349/section-349-937](https://corpuslaw.us/codes/nevada/title-30/chapter-349/section-349-937)
- **Semantic URL**: [https://corpuslaw.us/codes/nevada/title-30/chapter-349/section-349-937](https://corpuslaw.us/codes/nevada/title-30/chapter-349/section-349-937)

## Hierarchy

Title 30 — PUBLIC BORROWING AND OBLIGATIONS > Chapter 349 — STATE OBLIGATIONS

## Text

Cost of a water project means all or a designated part of the cost of any water project, including any incidental cost pertaining to the water project. The cost of a water project may include, among other costs, the costs of:

1. Surveys, audits, preliminary plans, other plans, specifications, estimates and other costs of preparations;

2. Appraising, printing, estimating, advice, services of engineers, architects, financial consultants, attorneys, clerical personnel and other agents and employees;

3. Publishing, posting, mailing and otherwise giving notice, filing or recording instruments, taking options and fees to banks;

4. Establishment of a reserve for contingencies;

5. Interest on bonds for any time which does not exceed the estimated period of construction plus 1 year, discounts on bonds, reserves for the payment of the principal of and interest on bonds, replacement expenses and other costs of issuing bonds;

6. Amending any resolution or other instrument authorizing the issuance of, or otherwise relating to, bonds for the water project; and

7. Short-term financing,

Ê and the expense of operation and maintenance of the water project.
