> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Nev. Rev. Stat. § 408.389 — Approval of Board of Directors required for purchase of certain equipment; analysis of costs and benefits of purchase and alternatives.

- **Citation**: Nev. Rev. Stat. § 408.389
- **Node Type**: section
- **Jurisdiction**: Nevada (state)
- **Code Body**: Nevada Revised Statutes (Nev. Rev. Stat.)
- **Official Source**: [https://www.leg.state.nv.us/nrs/NRS-408.html](https://www.leg.state.nv.us/nrs/NRS-408.html)
- **Canonical URL**: [https://corpuslaw.us/codes/nevada/title-34/chapter-408/section-408-389](https://corpuslaw.us/codes/nevada/title-34/chapter-408/section-408-389)
- **Semantic URL**: [https://corpuslaw.us/codes/nevada/title-34/chapter-408/section-408-389](https://corpuslaw.us/codes/nevada/title-34/chapter-408/section-408-389)

## Hierarchy

Title 34 — EDUCATION > Chapter 408 — HIGHWAYS, ROADS AND
TRANSPORTATION FACILITIES

## Text

1. Except as otherwise provided in subsection 2, the Department shall not purchase any equipment which exceeds $50,000, unless the purchase is first approved by the Board.

2. Before the Board may approve the purchase of any mobile equipment which exceeds $50,000, the Department shall:

(a) Prepare and present to the Board an analysis of the costs and benefits, including, without limitation, all related personnel costs, that are associated with:

(1) Purchasing, operating and maintaining the same item of equipment;

(2) Leasing, operating and maintaining the same item of mobile equipment; or

(3) Contracting for the performance of the work which would have been performed using the mobile equipment; and

(b) Justify the need for the purchase based on that analysis.

3. The Board shall not:

(a) Delegate to the Director its authority to approve purchases of equipment pursuant to subsection 1; or

(b) Approve any purchase of mobile equipment which exceeds $50,000 and for which the Department is unable to provide justification pursuant to subsection 2.
