# Nev. Rev. Stat. § 534.260 — Project for recharge, storage and recovery of water: Contents of application for permit.

- **Citation**: Nev. Rev. Stat. § 534.260
- **Node Type**: section
- **Jurisdiction**: Nevada (state)
- **Code Body**: Nevada Revised Statutes (Nev. Rev. Stat.)
- **Official Source**: [https://www.leg.state.nv.us/nrs/NRS-534.html](https://www.leg.state.nv.us/nrs/NRS-534.html)
- **Canonical URL**: [https://corpuslaw.us/codes/nevada/title-48/chapter-534/section-534-260](https://corpuslaw.us/codes/nevada/title-48/chapter-534/section-534-260)
- **Semantic URL**: [https://corpuslaw.us/codes/nevada/title-48/chapter-534/section-534-260](https://corpuslaw.us/codes/nevada/title-48/chapter-534/section-534-260)

## Hierarchy

Title 48 — WATER > Chapter 534 — UNDERGROUND WATER AND WELLS

## Text

The State Engineer shall prescribe and furnish guidelines for an application for a permit for a project. The application must include:

1. A fee for application of $2,500;

2. The name and mailing address of the applicant;

3. The name of the area of active management, groundwater basin or groundwater sub-basin, as applicable, in which the applicant proposes to operate the project;

4. The name and mailing address of the owner of the land on which the applicant proposes to operate the project;

5. The legal description of the location of the proposed project;

6. Such evidence of financial and technical capability as the State Engineer requires;

7. The source, quality and annual quantity of water proposed to be recharged, and the quality of the receiving water;

8. The legal basis for acquiring and using the water proposed to be recharged;

9. A description of the proposed project including its capacity and plan of operation;

10. A copy of a study that demonstrates:

(a) The area of hydrologic effect of the project;

(b) That the project is hydrologically feasible;

(c) That the project will not cause harm to users of land and water within the area of hydrologic effect; and

(d) The percentage of recoverable water;

11. The proposed duration of the permit; and

12. Any other information which the State Engineer requires.