> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Nev. Rev. Stat. § 704.7745 — Final inspection by utility; temporary disconnection and reconnection of electric service relating to installation.

- **Citation**: Nev. Rev. Stat. § 704.7745
- **Node Type**: section
- **Jurisdiction**: Nevada (state)
- **Code Body**: Nevada Revised Statutes (Nev. Rev. Stat.)
- **Official Source**: [https://www.leg.state.nv.us/nrs/NRS-704.html](https://www.leg.state.nv.us/nrs/NRS-704.html)
- **Canonical URL**: [https://corpuslaw.us/codes/nevada/title-58/chapter-704/section-704-7745](https://corpuslaw.us/codes/nevada/title-58/chapter-704/section-704-7745)
- **Semantic URL**: [https://corpuslaw.us/codes/nevada/title-58/chapter-704/section-704-7745](https://corpuslaw.us/codes/nevada/title-58/chapter-704/section-704-7745)

## Hierarchy

Title 58 — ENERGY; PUBLIC UTILITIES AND SIMILAR ENTITIES > Chapter 704 — REGULATION OF PUBLIC
UTILITIES GENERALLY

## Text

1. If a customer-generator has received all the necessary inspections from any governmental entity required for the installation of a net metering system and submits to a utility a request for the completion of a final inspection by the utility, the utility shall complete the final inspection within a reasonable time after receipt of the request in accordance with the regulations adopted pursuant to NRS 704.773 .

2. If a customer-generator submits to a utility a request to temporarily disconnect and subsequently reconnect electric service in relation to the installation of a net metering system, the utility shall schedule the temporary disconnection and subsequent reconnection within a reasonable time after receiving the request in accordance with the regulations adopted pursuant to NRS 704.773 .
