> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# NMSA 1978, § 62-16B-3 — Community solar facility requirements

- **Citation**: NMSA 1978, § 62-16B-3
- **Node Type**: section
- **Jurisdiction**: New Mexico (state)
- **Code Body**: New Mexico Statutes Annotated 1978 (through the 2026 session) (NMSA 1978)
- **Official Source**: [https://nmonesource.com/nmos/nmsa-unanno/en/item/18565/index.do#!b/62-16B-3](https://nmonesource.com/nmos/nmsa-unanno/en/item/18565/index.do#!b/62-16B-3)
- **Canonical URL**: [https://corpuslaw.us/codes/new-mexico/chapter-62/article-16b/section-62-16b-3](https://corpuslaw.us/codes/new-mexico/chapter-62/article-16b/section-62-16b-3)
- **Semantic URL**: [https://corpuslaw.us/codes/new-mexico/chapter-62/article-16b/section-62-16b-3](https://corpuslaw.us/codes/new-mexico/chapter-62/article-16b/section-62-16b-3)

## Hierarchy

Chapter 62 — Electric, Gas and Water Utilities > Article 16B — Community Solar

## Text

62-16B-3. Community solar facility requirements

A. A community solar facility shall:

(1) have a nameplate capacity rating of five megawatts alternating current or less;

(2) be located in the service territory of the qualifying utility and be interconnected to the electric distribution system of that qualifying utility;

(3) have at least ten subscribers;

(4) have the option to be co-located with other energy resources, but shall not be co-located with other community solar facilities;

(5) not allow a single subscriber to be allocated more than forty percent of the generating capacity of the facility; and

(6) make at least forty percent of the total generating capacity of a community solar facility available in subscriptions of twenty-five kilowatts or less.

B. The provisions of this section shall not apply to a native community solar project; provided that a native community solar project shall be located in the service territory of a qualifying utility and be interconnected to the electric distribution system of that qualifying utility.

Laws 2021, ch. 34, § 3.
