> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# NMSA 1978, § 72-12-22 — Replacement well within one hundred feet

- **Citation**: NMSA 1978, § 72-12-22
- **Node Type**: section
- **Jurisdiction**: New Mexico (state)
- **Code Body**: New Mexico Statutes Annotated 1978 (through the 2026 session) (NMSA 1978)
- **Official Source**: [https://nmonesource.com/nmos/nmsa-unanno/en/item/18575/index.do#!b/72-12-22](https://nmonesource.com/nmos/nmsa-unanno/en/item/18575/index.do#!b/72-12-22)
- **Canonical URL**: [https://corpuslaw.us/codes/new-mexico/chapter-72/article-12/section-72-12-22](https://corpuslaw.us/codes/new-mexico/chapter-72/article-12/section-72-12-22)
- **Semantic URL**: [https://corpuslaw.us/codes/new-mexico/chapter-72/article-12/section-72-12-22](https://corpuslaw.us/codes/new-mexico/chapter-72/article-12/section-72-12-22)

## Hierarchy

Chapter 72 — Water Law > Article 12 — Underground Waters

## Text

72-12-22. Replacement well within one hundred feet

A. The owner of a water right may drill and use a replacement well drilled within one hundred feet of the original well, prior to application to the state engineer, and the publication and hearing set out in Section 72-12-3 NMSA 1978, if:

(1) the well is drilled into the same and only the same underground stream, channel, artesian basin, reservoir or lake as the original well; and

(2) the appropriation is of the same amount of water allowed by his water right in the original well; and

(3) an emergency situation exists in which the delay caused by application, publication and hearing would result in crop loss or other serious economic loss; and

(4) he files application, or notifies the state engineer office of these facts and the location of the proposed replacement well by registered letter, prior to drilling; provided that he shall file application for a permit within thirty days after drilling begins.

B. The owners of other water rights who claim to be injured by the drilling of a replacement well under these circumstances, may not enjoin the drilling of such a well or the use of the water from the well, but are limited to an action at law to recover damages, and to their right to protest the granting of a permit.

1953 Comp., § 75-11-23, enacted by Laws 1959, ch. 41, § 1.
