> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# G.S. ch. 62, art. 6

- **Citation**: G.S. ch. 62, art. 6
- **Node Type**: article
- **Jurisdiction**: North Carolina (state)
- **Code Body**: North Carolina General Statutes (compiled through S.L. 2026-30) (G.S.)
- **Official Source**: [https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/ByChapter/Chapter_62.html](https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/ByChapter/Chapter_62.html)
- **Canonical URL**: [https://corpuslaw.us/codes/north-carolina/chapter-62/article-6](https://corpuslaw.us/codes/north-carolina/chapter-62/article-6)
- **Semantic URL**: [https://corpuslaw.us/codes/north-carolina/chapter-62/article-6](https://corpuslaw.us/codes/north-carolina/chapter-62/article-6)

## Hierarchy

Chapter 62

## Sections

| Citation | Heading | Type | Link |
| --- | --- | --- | --- |
| G.S. 62-110 | Certificate of convenience and necessity. | section | [View](https://corpuslaw.us/code/1a431add-ae51-4632-b3b3-ee074f1f754e.md) |
| G.S. 62-110.1 | Certificate for construction of generating facility; analysis of long-range needs for expansion of facilities; ongoing review of construction costs; inclusion of approved construction costs in rates. | section | [View](https://corpuslaw.us/code/4c25736e-8d55-49cb-af60-580376fd5976.md) |
| G.S. 62-110.2 | Electric service areas outside of municipalities. | section | [View](https://corpuslaw.us/code/5146d776-591b-4da3-be64-d648d955b653.md) |
| G.S. 62-110.3 | Bond required for water and sewer companies. | section | [View](https://corpuslaw.us/code/d061a3ae-82a9-4155-af43-6caa942c34a9.md) |
| G.S. 62-110.4 | Alternative Operator Services. | section | [View](https://corpuslaw.us/code/25d3c167-dd79-44a4-a4cf-06c84db45552.md) |
| G.S. 62-110.5 | Commission may exempt certain nonprofit and consumer-owned water or sewer utilities. | section | [View](https://corpuslaw.us/code/8274d5a4-72fc-4d22-8ab9-25c926ad28e7.md) |
| G.S. 62-110.6 | Rate recovery for construction costs of out-of-state electric generating facilities. | section | [View](https://corpuslaw.us/code/55f5847f-907d-4d0c-8805-12582f8f0e2b.md) |
| G.S. 62-110.7 | Project development cost review for a nuclear facility. | section | [View](https://corpuslaw.us/code/259c2cc5-2499-481e-a760-01e7d82df66a.md) |
| G.S. 62-110.8 | Competitive procurement of renewable energy. | section | [View](https://corpuslaw.us/code/74fc3304-175f-4a07-8c56-dacac5b67c20.md) |
| G.S. 62-110.9 | Requirements concerning reductions in emissions of carbon dioxide from electric public utilities. | section | [View](https://corpuslaw.us/code/4de36389-e174-407b-b07f-a6f23cca340d.md) |
| G.S. 62-111 | Transfers of franchises; mergers, consolidations and combinations of public utilities. | section | [View](https://corpuslaw.us/code/da293a14-e62c-4cf7-ba4a-3a0f0d29383c.md) |
| G.S. 62-112 | Effective date, suspension and revocation of franchises; dormant motor carrier franchises. | section | [View](https://corpuslaw.us/code/b7bb9c30-1f77-4c17-8827-6faf5654953a.md) |
| G.S. 62-113 | Terms and conditions of franchises. | section | [View](https://corpuslaw.us/code/e29a997b-1b42-4e96-977f-8bc85e2eb9a3.md) |
| G.S. 62-115 | Issuance of partnership franchises. | section | [View](https://corpuslaw.us/code/4a55edf6-1832-490a-9f7b-f589073d4558.md) |
| G.S. 62-116 | Issuance of temporary or emergency authority. | section | [View](https://corpuslaw.us/code/40650c91-2675-4c24-993a-93fa9578556c.md) |
| G.S. 62-117 | Same or similar names prohibited. | section | [View](https://corpuslaw.us/code/819e3402-676d-494b-baea-8d1f49a52811.md) |
| G.S. 62-118 | Abandonment and reduction of service. | section | [View](https://corpuslaw.us/code/305fdcd9-ab17-4830-b51c-e95edaa95297.md) |
