> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# 40 O.S. § 141.15 — Certificate of operation required - Violations.

- **Citation**: 40 O.S. § 141.15
- **Node Type**: section
- **Jurisdiction**: Oklahoma (state)
- **Code Body**: Oklahoma Statutes (through the 2024 or 2025 session, by title) (O.S.)
- **Official Source**: [https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os40.pdf#page=224](https://www.oklegislature.gov/OK_Statutes/CompleteTitles/os40.pdf#page=224)
- **Canonical URL**: [https://corpuslaw.us/codes/oklahoma/title-40/section-40-141-15](https://corpuslaw.us/codes/oklahoma/title-40/section-40-141-15)
- **Semantic URL**: [https://corpuslaw.us/codes/oklahoma/title-40/section-40-141-15](https://corpuslaw.us/codes/oklahoma/title-40/section-40-141-15)

## Hierarchy

Title 40 — LABOR

## Text

40-141.15. Certificate of operation required - Violations.

After twelve (12) months for power boilers, twenty-four (24) months for low pressure steam heating, hot water heating and hot water supply boilers, and thirty-six (36) months for pressure vessels following the date on which this act becomes effective, it shall be unlawful for any person, firm, partnership or corporation to operate in this state a boiler or pressure vessel covered by this act, including boilers and pressure vessels covered by owner-user inspection service provided for in Section 14, without a valid certificate of operation. The operation of a boiler or pressure vessel without such certificate of operation, or at a pressure exceeding that specified in such certificate of operation or in violation of this act or the rules and regulations promulgated under it, shall constitute a misdemeanor on the part of the owner, user or operator thereof. Each day of such unlawful operation shall be deemed a separate offense.

Added by Laws 1982, c. 252, § 15.
