> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Or. Rev. Stat. § 536.750 — Powers of commission after declaration of drought; rules

- **Citation**: Or. Rev. Stat. § 536.750
- **Node Type**: section
- **Jurisdiction**: Oregon (state)
- **Code Body**: Oregon Revised Statutes (2025 edition) (ORS)
- **Official Source**: [https://www.oregonlegislature.gov/bills_laws/ors/ors536.html#536.750](https://www.oregonlegislature.gov/bills_laws/ors/ors536.html#536.750)
- **Canonical URL**: [https://corpuslaw.us/codes/oregon/title-45/chapter-536/section-536-750](https://corpuslaw.us/codes/oregon/title-45/chapter-536/section-536-750)
- **Semantic URL**: [https://corpuslaw.us/codes/oregon/title-45/chapter-536/section-536-750](https://corpuslaw.us/codes/oregon/title-45/chapter-536/section-536-750)

## Hierarchy

Title 45 — Water Resources: Irrigation, Drainage, Flood Control, Reclamation > Chapter 536 — Water Resources Administration

## Text

536.750. Powers of commission after declaration of drought; rules

(1) Notwithstanding any provision of ORS chapters 536 to 543A, after a declaration that a severe, continuing drought exists, the Water Resources Commission may:

(a) Issue without first conducting a hearing under ORS 536.077 and 537.170 a temporary permit for an emergency use of water;

(b) Allow a temporary change in use, place of use or point of diversion of water without complying with the notice and waiting requirements under ORS 540.520;

(c) Notwithstanding the priority of water rights, grant preference of use to rights for human consumption or stock watering use;

(d) Waive the notice requirements under ORS 537.753 and the start card required under ORS 537.762;

(e) Allow a temporary exchange of water without giving notice as required under ORS 540.535; and

(f) Utilize an expedited notice and waiting requirement established by rule for the substitution of a supplemental ground water right for a primary water right under drought conditions.

(2) The commission by rule may establish procedures for carrying out the provisions of this section and a schedule of fees that must accompany a request under subsection (1) of this section.

1989 c.87 §3; 1999 c.873 §20; 2001 c.788 §1; 2021 c.610 §5; 2025 c.575 §26
