> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Or. Rev. Stat. § 541.040 — Headgate; mode of construction

- **Citation**: Or. Rev. Stat. § 541.040
- **Node Type**: section
- **Jurisdiction**: Oregon (state)
- **Code Body**: Oregon Revised Statutes (2025 edition) (ORS)
- **Official Source**: [https://www.oregonlegislature.gov/bills_laws/ors/ors541.html#541.040](https://www.oregonlegislature.gov/bills_laws/ors/ors541.html#541.040)
- **Canonical URL**: [https://corpuslaw.us/codes/oregon/title-45/chapter-541/section-541-040](https://corpuslaw.us/codes/oregon/title-45/chapter-541/section-541-040)
- **Semantic URL**: [https://corpuslaw.us/codes/oregon/title-45/chapter-541/section-541-040](https://corpuslaw.us/codes/oregon/title-45/chapter-541/section-541-040)

## Hierarchy

Title 45 — Water Resources: Irrigation, Drainage, Flood Control, Reclamation > Chapter 541 — Water Distributors; Water Releases; Conservation and Storage;

## Text

541.040. Headgate; mode of construction

Every corporation having constructed a ditch, canal or flume under the provisions of the Act of 1891, pages 52 to 60, Oregon Laws 1891, shall erect and keep in good repair a headgate at the head of its ditch, canal or flume, which, together with the necessary embankments, shall be of sufficient height and strength to control the water at all ordinary stages. The framework of the headgate shall be of timber not less than four inches square, and the bottom, sides and gate shall be of plank not less than two inches in thickness.
