> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Or. Rev. Stat. § 542.030 — Report by commission; contents; copies for public inspection

- **Citation**: Or. Rev. Stat. § 542.030
- **Node Type**: section
- **Jurisdiction**: Oregon (state)
- **Code Body**: Oregon Revised Statutes (2025 edition) (ORS)
- **Official Source**: [https://www.oregonlegislature.gov/bills_laws/ors/ors542.html#542.030](https://www.oregonlegislature.gov/bills_laws/ors/ors542.html#542.030)
- **Canonical URL**: [https://corpuslaw.us/codes/oregon/title-45/chapter-542/section-542-030](https://corpuslaw.us/codes/oregon/title-45/chapter-542/section-542-030)
- **Semantic URL**: [https://corpuslaw.us/codes/oregon/title-45/chapter-542/section-542-030](https://corpuslaw.us/codes/oregon/title-45/chapter-542/section-542-030)

## Hierarchy

Title 45 — Water Resources: Irrigation, Drainage, Flood Control, Reclamation > Chapter 542 — Water Resource Surveys and Projects; Compacts

## Text

542.030. Report by commission; contents; copies for public inspection

As soon as practicable after the completion of the surveys and investigations, the Water Resources Commission shall prepare or have prepared a report setting forth the plans, specifications and estimated cost of construction, maintenance and operation of the projects, together with any other information tending to show their feasibility, and may in the discretion of the commission have the report printed in pamphlet form and distributed to those interested. Copies of completed maps, plans, specifications, estimates and reports secured or prepared in connection with any such investigation shall be kept on file in the Water Resources Department at all times, and open for public inspection during business hours.

Amended by 1985 c.673 §131
