> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Or. Rev. Stat. § 543.092 — Amendment of hydroelectric water right or claim; rules; unilateral amendment of power claim or uncertificated claim to assess project specific fees

- **Citation**: Or. Rev. Stat. § 543.092
- **Node Type**: section
- **Jurisdiction**: Oregon (state)
- **Code Body**: Oregon Revised Statutes (2025 edition) (ORS)
- **Official Source**: [https://www.oregonlegislature.gov/bills_laws/ors/ors543.html#543.092](https://www.oregonlegislature.gov/bills_laws/ors/ors543.html#543.092)
- **Canonical URL**: [https://corpuslaw.us/codes/oregon/title-45/chapter-543/section-543-092](https://corpuslaw.us/codes/oregon/title-45/chapter-543/section-543-092)
- **Semantic URL**: [https://corpuslaw.us/codes/oregon/title-45/chapter-543/section-543-092](https://corpuslaw.us/codes/oregon/title-45/chapter-543/section-543-092)

## Hierarchy

Title 45 — Water Resources: Irrigation, Drainage, Flood Control, Reclamation > Chapter 543 — Hydroelectric Projects

## Text

543.092. Amendment of hydroelectric water right or claim; rules; unilateral amendment of power claim or uncertificated claim to assess project specific fees

(1) Upon the request of the holder and the approval of the Water Resources Department, a hydroelectric water right or claim may be amended.

(2) The Water Resources Department shall develop rules governing the process by which a hydroelectric water right or claim may be amended. Any amendments under subsection (1) of this section shall:

(a) Be consistent with the final unified state position for the project;

(b) Be consistent with the requirements of ORS chapter 543A;

(c) Cause no injury to other water rights; and

(d) Allow for public participation in the amendment process.

(3) The Water Resources Director may unilaterally amend a power claim or uncertificated claim in order to assess project specific fees under ORS 543.080.

1999 c.873 §11
