> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Or. Rev. Stat. § 543A.150 — Modification of time limits

- **Citation**: Or. Rev. Stat. § 543A.150
- **Node Type**: section
- **Jurisdiction**: Oregon (state)
- **Code Body**: Oregon Revised Statutes (2025 edition) (ORS)
- **Official Source**: [https://www.oregonlegislature.gov/bills_laws/ors/ors543a.html#543A.150](https://www.oregonlegislature.gov/bills_laws/ors/ors543a.html#543A.150)
- **Canonical URL**: [https://corpuslaw.us/codes/oregon/title-45/chapter-543a/section-543a-150](https://corpuslaw.us/codes/oregon/title-45/chapter-543a/section-543a-150)
- **Semantic URL**: [https://corpuslaw.us/codes/oregon/title-45/chapter-543a/section-543a-150](https://corpuslaw.us/codes/oregon/title-45/chapter-543a/section-543a-150)

## Hierarchy

Title 45 — Water Resources: Irrigation, Drainage, Flood Control, Reclamation > Chapter 543A — Reauthorizing and Decommissioning Hydroelectric Project

## Text

543A.150. Modification of time limits

(1) The Water Resources Department may extend the time limits set forth in ORS 543A.005 to 543A.145 and 543A.300 for a reasonable period of time if the time limits are incompatible with the substantive requirements applicable to applications to reauthorize a water right for the use of water for hydroelectric purposes.

(2) The expiration date of the water right for any project that begins the reauthorization process under ORS 543A.005 to 543A.410 before the expiration date shall be extended by the department if necessary to allow for completion of the reauthorization process.

1997 c.449 §31
