> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Or. Rev. Stat. § 757.375 — Credit toward compliance with renewable portfolio standard; limits

- **Citation**: Or. Rev. Stat. § 757.375
- **Node Type**: section
- **Jurisdiction**: Oregon (state)
- **Code Body**: Oregon Revised Statutes (2025 edition) (ORS)
- **Official Source**: [https://www.oregonlegislature.gov/bills_laws/ors/ors757.html#757.375](https://www.oregonlegislature.gov/bills_laws/ors/ors757.html#757.375)
- **Canonical URL**: [https://corpuslaw.us/codes/oregon/title-57/chapter-757/section-757-375](https://corpuslaw.us/codes/oregon/title-57/chapter-757/section-757-375)
- **Semantic URL**: [https://corpuslaw.us/codes/oregon/title-57/chapter-757/section-757-375](https://corpuslaw.us/codes/oregon/title-57/chapter-757/section-757-375)

## Hierarchy

Title 57 — Utility Regulation > Chapter 757 — Utility Regulation Generally

## Text

757.375. Credit toward compliance with renewable portfolio standard; limits

(1) Any electricity produced from a solar photovoltaic energy system that is physically located in this state may be used by an electric company to comply with the renewable portfolio standard established under ORS 469A.005 to 469A.210.

(2) For each kilowatt-hour of electricity produced from a qualifying system that first becomes operational before January 1, 2016, and has a nameplate capacity of between 500 kilowatts and five megawatts of alternating current, the Public Utility Commission shall credit the electric company with two kilowatt-hours of qualifying electricity toward the electric company’s compliance with the renewable portfolio standard under ORS 469A.005 to 469A.210, up to a maximum of 20 megawatts of capacity.

Note: See note under 757.360.

2009 c.748 §4; 2016 c.28 §24
