> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Or. Rev. Stat. § 758.535 — Criteria for qualifying facility; terms and conditions of energy sale

- **Citation**: Or. Rev. Stat. § 758.535
- **Node Type**: section
- **Jurisdiction**: Oregon (state)
- **Code Body**: Oregon Revised Statutes (2025 edition) (ORS)
- **Official Source**: [https://www.oregonlegislature.gov/bills_laws/ors/ors758.html#758.535](https://www.oregonlegislature.gov/bills_laws/ors/ors758.html#758.535)
- **Canonical URL**: [https://corpuslaw.us/codes/oregon/title-57/chapter-758/section-758-535](https://corpuslaw.us/codes/oregon/title-57/chapter-758/section-758-535)
- **Semantic URL**: [https://corpuslaw.us/codes/oregon/title-57/chapter-758/section-758-535](https://corpuslaw.us/codes/oregon/title-57/chapter-758/section-758-535)

## Hierarchy

Title 57 — Utility Regulation > Chapter 758 — Utility Rights of Way and Territory Allocation; Cogeneration

## Text

758.535. Criteria for qualifying facility; terms and conditions of energy sale

(1) The Public Utility Commission shall establish minimum criteria that a cogeneration facility or small power production facility must meet to qualify as a qualifying facility under ORS 543.610, 757.005 and 758.505 to 758.555.

(2) The terms and conditions for the purchase of energy or energy and capacity from a qualifying facility shall:

(a) Be established by rule by the commission if the purchase is by a public utility;

(b) Be adopted by an electric cooperative or people’s utility district according to the applicable provision of ORS chapter 62 or 261; and

(c) Be established by a municipal utility according to the requirements of the municipality’s charter and ordinance.

(3) The rules or policies adopted under subsection (2) of this section also shall:

(a) Establish safety and operating requirements necessary to adequately protect all systems, facilities and equipment of the electric utility and qualifying facility;

(b) Establish the eligibility cap for standard avoided costs rates and contracts for the purchase of energy or energy and capacity from qualifying facilities at no less than 10 megawatts;

(c) Be consistent with applicable standards required by the Public Utility Regulatory Policies Act of 1978 (P.L. 95-617); and

(d) Be made available to the public at the commission’s office.

1983 c.799 §4; 2025 c.149 §1
