# Tex. GOV'T Code § 2166.153. — CONTENTS OF PROJECT ANALYSIS.

- **Citation**: Tex. GOV'T Code § 2166.153.
- **Node Type**: section
- **Jurisdiction**: Texas (state)
- **Code Body**: Texas Statutes (Tex. Code)
- **Official Source**: [https://statutes.capitol.texas.gov/](https://statutes.capitol.texas.gov/)
- **Canonical URL**: [https://corpuslaw.us/codes/texas/government-code/title-10/chapter-2166/section-2166-153](https://corpuslaw.us/codes/texas/government-code/title-10/chapter-2166/section-2166-153)
- **Semantic URL**: [https://corpuslaw.us/codes/texas/government-code/title-10/chapter-2166/section-2166-153](https://corpuslaw.us/codes/texas/government-code/title-10/chapter-2166/section-2166-153)

## Hierarchy

Title 10 — GENERAL GOVERNMENT > Chapter 2166 — BUILDING CONSTRUCTION AND ACQUISITION AND DISPOSITION OF REAL PROPERTY

## Text

(a)  A project analysis consists of:

(1)  a complete description of the project and a justification of the project prepared by the using agency;

(2)  a detailed estimate of the amount of space needed to meet the needs of the using agency and to allow for realistic growth;

(3)  a description of the proposed project prepared by a design professional that:

(A)  includes schematic plans and outline specifications describing the type of construction and probable materials to be used; and

(B)  is sufficient to establish the general scope and quality of construction;

(4)  an estimate of the probable cost of construction;

(5)  a description of the proposed site of the project and an estimate of the cost of site preparation;

(6)  an overall estimate of the cost of the project, including necessary funding for life-cycle costing, whole building integrated design, commissioning, and postoccupancy building performance verification;

(7)  information prepared under Section 2166.451 about historic structures considered as alternatives to new construction;

(8)  an evaluation of energy alternatives and energy-efficient architectural and engineering design alternatives as required by Sections 2166.401 , 2166.403 , and 2166.408 ; and

(9)  other information required by the commission.

(b)  A project analysis may include two or more alternative proposals for meeting the using agency's space needs by:

(1)  new construction;

(2)  the acquisition and rehabilitation of an existing or historic structure;  or

(3)  a combination of new and existing structures.

(c)  If any part of a project involves the construction or rehabilitation of a building that is to be used primarily as a parking garage or for office space for state government, the project analysis also must include:

(1)  a description of the amount and location of space in the building that can be made available for lease to private tenants under Subchapter E , Chapter 2165 ;  or

(2)  a statement of the reason that lease of space in the building to private tenants is not feasible.

(d)  All estimates involved in the preparation of a project analysis shall be carefully and fully documented and incorporated into the project analysis.

Added by Acts 1995, 74th Leg., ch. 41, Sec. 1, eff. Sept. 1, 1995.