# Tex. UTIL Code § 37.052. — EXCEPTIONS TO CERTIFICATE REQUIREMENT FOR SERVICE EXTENSION.

- **Citation**: Tex. UTIL Code § 37.052.
- **Node Type**: section
- **Jurisdiction**: Texas (state)
- **Code Body**: Texas Statutes (Tex. Code)
- **Official Source**: [https://statutes.capitol.texas.gov/](https://statutes.capitol.texas.gov/)
- **Canonical URL**: [https://corpuslaw.us/codes/texas/utilities-code/title-2/chapter-37/section-37-052](https://corpuslaw.us/codes/texas/utilities-code/title-2/chapter-37/section-37-052)
- **Semantic URL**: [https://corpuslaw.us/codes/texas/utilities-code/title-2/chapter-37/section-37-052](https://corpuslaw.us/codes/texas/utilities-code/title-2/chapter-37/section-37-052)

## Hierarchy

Title 2 — PUBLIC UTILITY REGULATORY ACT > Chapter 37 — CERTIFICATES OF CONVENIENCE AND NECESSITY

## Text

(a)  An electric utility is not required to obtain a certificate for an:

(1)  extension into territory that is:

(A)  contiguous to the territory the electric utility serves;

(B)  not receiving similar service from another electric utility;  and

(C)  not in another electric utility's certificated area;

(2)  extension in or to territory the utility serves or is authorized to serve under a certificate;  or

(3)  operation, extension, or service in progress on September 1, 1975.

(b)  An extension allowed under Subsection (a) is limited to a device used:

(1)  to interconnect existing facilities;  or

(2)  solely to transmit electric utility services from an existing facility to a customer of retail electric utility service.

(c)  An electric utility is not required to amend the utility's certificate of public convenience and necessity to construct a transmission line that connects the utility's existing transmission facilities to a substation or metering point if:

(1)  the transmission line does not exceed:

(A)  five miles in length, if the line connects to a load-serving substation or metering point; or

(B)  two miles in length, if the line connects to a generation substation or metering point;

(2)  each landowner whose property would be directly affected by the transmission line, as provided by commission rules, provides written consent for the transmission line; and

(3)  all rights-of-way necessary for construction of the transmission line have been purchased.