> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# Utah Code § 56-1-4 — Construction required within limited time.

- **Citation**: Utah Code § 56-1-4
- **Node Type**: section
- **Jurisdiction**: Utah (state)
- **Code Body**: Utah Code (current version as served 2026-10-18) (Utah Code)
- **Official Source**: [https://le.utah.gov/xcode/Title56/Chapter1/56-1-S4.html?v=C56-1-S4_1800010118000101](https://le.utah.gov/xcode/Title56/Chapter1/56-1-S4.html?v=C56-1-S4_1800010118000101)
- **Canonical URL**: [https://corpuslaw.us/codes/utah/title-56/chapter-56-1/section-56-1-4](https://corpuslaw.us/codes/utah/title-56/chapter-56-1/section-56-1-4)
- **Semantic URL**: [https://corpuslaw.us/codes/utah/title-56/chapter-56-1/section-56-1-4](https://corpuslaw.us/codes/utah/title-56/chapter-56-1/section-56-1-4)

## Hierarchy

Title 56 — Railroads > Chapter 56-1 — General Provisions

## Text

56-1-4. Construction required within limited time.

If a railroad corporation which proposes to construct a railroad shall not within three years after its incorporation begin the construction of its railroad and expend thereon an amount equal to at least $300 for each mile of the proposed line referred to in its articles of incorporation, or if it shall fail to finish the road and put the same into full operation within 10 years after its incorporation, its franchise as to all parts of its line not then constructed shall be deemed forfeited.

No Change Since 1953
