> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# 19 V.S.A. § 2906 — Electric vehicle supply equipment goals

- **Citation**: 19 V.S.A. § 2906
- **Node Type**: section
- **Jurisdiction**: Vermont (state)
- **Code Body**: Vermont Statutes Annotated (through the 2026 session) (V.S.A.)
- **Official Source**: [https://legislature.vermont.gov/statutes/section/19/029/02906](https://legislature.vermont.gov/statutes/section/19/029/02906)
- **Canonical URL**: [https://corpuslaw.us/codes/vermont/title-19/chapter-29/section-2906](https://corpuslaw.us/codes/vermont/title-19/chapter-29/section-2906)
- **Semantic URL**: [https://corpuslaw.us/codes/vermont/title-19/chapter-29/section-2906](https://corpuslaw.us/codes/vermont/title-19/chapter-29/section-2906)

## Hierarchy

Title 19 — Highways > Chapter 29 — Vehicle Incentive Programs; Electric Vehicle Supply Equipment

## Text

2906. Electric vehicle supply equipment goals

It shall be the goal of the State to have, as practicable, level 3 EVSE charging ports available to the public:

(1) within three driving miles of every exit of the Dwight D. Eisenhower National System of Interstate and Defense Highways within the State;

(2) within 25 driving miles of another level 3 EVSE charging port available to the public along a State highway, as defined in subdivision 1(20) of this title; and

(3) co-located with or within a safe and both walkable and rollable distance of publicly accessible amenities such as restrooms, restaurants, and convenience stores to provide a safe, consistent, and convenient experience for the traveling public along the State highway system.

Added 2023, No. 148 (Adj. Sess.), § 23, eff. July 1, 2024.
