# RCW 39.06.020 — Verification of subcontractor responsibility criteria.

- **Citation**: RCW 39.06.020
- **Node Type**: section
- **Jurisdiction**: Washington (state)
- **Code Body**: Revised Code of Washington (RCW)
- **Official Source**: [https://app.leg.wa.gov/RCW/default.aspx?cite=39.06&full=true](https://app.leg.wa.gov/RCW/default.aspx?cite=39.06&full=true)
- **Canonical URL**: [https://corpuslaw.us/codes/washington/title-39/chapter-39-06/section-39-06-020](https://corpuslaw.us/codes/washington/title-39/chapter-39-06/section-39-06-020)
- **Semantic URL**: [https://corpuslaw.us/codes/washington/title-39/chapter-39-06/section-39-06-020](https://corpuslaw.us/codes/washington/title-39/chapter-39-06/section-39-06-020)

## Hierarchy

Title 39 — PUBLIC CONTRACTS AND INDEBTEDNESS > Chapter 39.06 — PUBLIC WORKS — REGISTRATION, LICENSING, OF CONTRACTORS

## Text

A public works contractor must verify responsibility criteria for each first tier subcontractor, and a subcontractor of any tier that hires other subcontractors must verify responsibility criteria for each of its subcontractors. Verification shall include that each subcontractor, at the time of subcontract execution, meets the responsibility criteria listed in RCW 39.04.350 (1) and possesses an electrical contractor license, if required by chapter 19.28 RCW, an elevator contractor license, if required by chapter 70.87 RCW, or a plumbing contractor license[,] if required by chapter 18.106 RCW. This verification requirement, as well as the responsibility criteria, must be included in every public works contract and subcontract of every tier.