# RCW 39.35.040 — Facility design to include life-cycle cost analysis.

- **Citation**: RCW 39.35.040
- **Node Type**: section
- **Jurisdiction**: Washington (state)
- **Code Body**: Revised Code of Washington (RCW)
- **Official Source**: [https://app.leg.wa.gov/RCW/default.aspx?cite=39.35&full=true](https://app.leg.wa.gov/RCW/default.aspx?cite=39.35&full=true)
- **Canonical URL**: [https://corpuslaw.us/codes/washington/title-39/chapter-39-35/section-39-35-040](https://corpuslaw.us/codes/washington/title-39/chapter-39-35/section-39-35-040)
- **Semantic URL**: [https://corpuslaw.us/codes/washington/title-39/chapter-39-35/section-39-35-040](https://corpuslaw.us/codes/washington/title-39/chapter-39-35/section-39-35-040)

## Hierarchy

Title 39 — PUBLIC CONTRACTS AND INDEBTEDNESS > Chapter 39.35 — ENERGY CONSERVATION IN DESIGN OF PUBLIC FACILITIES

## Text

Whenever a public agency determines that any major facility or a critical governmental facility is to be constructed or renovated, such agency shall cause to be included in the design phase of such construction or renovation a provision that requires a life-cycle cost analysis conforming with the guidelines developed in RCW 39.35.050 to be prepared for such facility. Such analysis shall be approved by the agency prior to the commencement of actual construction or renovation. A public agency may accept the facility design if the agency is satisfied that the life-cycle cost analysis provides for an efficient energy system or systems based on the economic life of the facility.

Nothing in this section prohibits the construction or renovation of major facilities or critical governmental facilities that utilize renewable energy or combined heat and power systems.