> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# RCW 4.16.320 — Actions or claims arising from construction, alteration, repair, design, planning, survey, engineering, etc., of improvements upon real property — Construction.

- **Citation**: RCW 4.16.320
- **Node Type**: section
- **Jurisdiction**: Washington (state)
- **Code Body**: Revised Code of Washington (RCW)
- **Official Source**: [https://app.leg.wa.gov/RCW/default.aspx?cite=4.16&full=true](https://app.leg.wa.gov/RCW/default.aspx?cite=4.16&full=true)
- **Canonical URL**: [https://corpuslaw.us/codes/washington/title-4/chapter-4-16/section-4-16-320](https://corpuslaw.us/codes/washington/title-4/chapter-4-16/section-4-16-320)
- **Semantic URL**: [https://corpuslaw.us/codes/washington/title-4/chapter-4-16/section-4-16-320](https://corpuslaw.us/codes/washington/title-4/chapter-4-16/section-4-16-320)

## Hierarchy

Title 4 — CIVIL PROCEDURE > Chapter 4.16 — LIMITATION OF ACTIONS

## Text

Nothing in RCW 4.16.300 through 4.16.320 shall be construed as extending the period now permitted by law for bringing any kind of action.
