> For AI agents: read the machine-readable documentation index at [https://corpuslaw.us/llms.txt](https://corpuslaw.us/llms.txt) or the single-file full reference at [https://corpuslaw.us/llms-full.txt](https://corpuslaw.us/llms-full.txt).

# RCW 4.16.325 — Actions or claims arising from construction defect claims — Statute tolled.

- **Citation**: RCW 4.16.325
- **Node Type**: section
- **Jurisdiction**: Washington (state)
- **Code Body**: Revised Code of Washington (RCW)
- **Official Source**: [https://app.leg.wa.gov/RCW/default.aspx?cite=4.16&full=true](https://app.leg.wa.gov/RCW/default.aspx?cite=4.16&full=true)
- **Canonical URL**: [https://corpuslaw.us/codes/washington/title-4/chapter-4-16/section-4-16-325](https://corpuslaw.us/codes/washington/title-4/chapter-4-16/section-4-16-325)
- **Semantic URL**: [https://corpuslaw.us/codes/washington/title-4/chapter-4-16/section-4-16-325](https://corpuslaw.us/codes/washington/title-4/chapter-4-16/section-4-16-325)

## Hierarchy

Title 4 — CIVIL PROCEDURE > Chapter 4.16 — LIMITATION OF ACTIONS

## Text

If a written notice of claim is served under RCW 64.50.020 within the time prescribed for the filing of an action under this chapter, the statutes of limitations for construction-related claims are tolled until sixty days after the period of time during which the filing of an action is barred under RCW 64.50.020 .
